House Update

Sat 09 01, 2007 | Posted by Mike

Okay - here’s the story.
We’ve got the kitchen all unpacked, we’re just waiting for my office to be set up so that we can get all the wires and electronics out of the kitchen, and then we can decide what to do with the “eat -in” area.
The dining room is done.
The living room needs a ceiling fan.
The office is the worst - it needs two dry wall walls - a door - a new desk (ordered - coming on Monday) shelves and all the boxes unpacked and electronics set up.
The 3 big kids room has a new light fixture - a blue star with three (count ‘em - 3) light bulb thingys. We need to come up with a permanent closet/desk/hanging space solution in there- but for now it’s under control.
Leora’s room/guest room is set - just need a curtain to put on the curtain rod, the stuffed animals put up in the hammock (hammock is up already) and figure out what to do with the side of the closet that doesn’t have formica.
MDBR needs closets!!! And a ceiling fan.
Main Bathroom need hanging pole and shower curtain.
Porch needs pergola (ordered) and side closed in as a storage room.
Still need to bring in the fishtank. And we MUST go food shopping.
That’s the latest. Please tune in next time as our hero battles the evil forces of the decepticons.

Tags:
 

Page 1 of 1 pages
 
login |register |check your email